Tree selection – why is it so important?

 

Trees are a natural asset and their benefit to the visual environment can be easily understated. We may think of a typical English countryside view with rolling fields, hedges and specimen Oak trees dotted around. Find out why tree selection is so important below:

Tree Selection

But do we ever think of the other benefits trees present to the local fauna and flora?

Trees absorb all sorts of toxins from the air, which is why when you walk around a wood the air always smells and feels that little bit fresher and cleaner. An acre of mature woodland can provide enough oxygen for 18 people and that makes trees pretty important! They also provide significant sources of food and shelter for small woodland animals, birds and insects, all of which are imperative to our ecosystem.

When we pick a tree for a site or our garden, we will want a specimen tree or at least one that will be a real feature as it grows. We should, however, consider a number of things. These include; the size, the spread and height, when and if the tree has visible flowers, the scent, the colour of the leaves in each of the seasons and whether the tree will improve the surrounding environment, perhaps by creating a food source for birds or other small animals.

There are also other types of interest that a tree can bring to its surroundings – bark can be of great interest. Corylus avellana ‘contorta’ has twisted stems and looks great but especially so in the winter when it has no leaves. Whereas, Acer davidii, also known as the “Snake bark Acer”, looks amazing with green and white serpentine stripes on its bark.

Other trees, such as the Tulip tree, Liriodendron tulipifera, is a larger tree which has tulip like flowers when it matures at around the age of 40 years. As can be seen from this tree, sometimes planting a tree is a long-term investment and perhaps even for the benefit of the next generation. This is especially true if you are planting trees that don’t become mature for in excess of 50 years such as the Oak, Beech and Sequoiadendron giganteum that can live for more than 3,000 years!

Tree Selection

 

More commonly found trees suited for planting in a normal sized back garden can include the Amelanchier x grandiflora ‘Ballerina’. This is a pretty specimen tree and well worth the space, with lovely blossom in the spring and bright red foliage as it emerges. It also has small dark purple or black fruits in the autumn, which are edible. Another bonus that this tree brings is the fabulous bright red and yellow colours that the leaves turn in the autumn. A truly great tree for a small garden.

An evergreen tree that is another great choice is the Magnolia grandiflora, a lovely tree which has fabulous white or cream flowers. This tree looks great

and gives additional privacy all year round which is especially important when your garden is overlooked by neighbours!

One final tree we couldn’t not mention is the Davidia involucrata, commonly known as the Handkerchief tree. This is a beautiful tree. Discovered in 1869 and introduced to England in 1904, it has large white bracts that are followed by large oval fruits. If you have the space, a sheltered position and fertile soil this tree will prove to a real spectacle within your garden!

If you need any advice on the choice of trees for your site or garden, and especially so if you want the perfect specimen tree, please do contact us and we will be happy to advise.

 

ProHort also provide other tree related services, including tree surveys and tree preservation order applications and appeals. Why not get in touch to find out more about how we can help you?

The Landscape Institute and Brexit.

The Landscape Institute believes that a no-deal Brexit could be disastrous for the landscape profession in UK and Europe. This would further exacerbate our current skills shortages.

 Landscape Institute and Brexit

Talent and recognition

Around 40% of employers in our sector are already suffering skills shortages. The impact on future talent is a major concern. 8% of our Landscape Institute members are citizens of EU countries, outside of the UK and the profession cannot afford to lose them.

One of our major concerns is that we may lose recognition of our professional qualification across Europe with a no-deal Brexit. This would hamper UK professionals’ ability to provide services to European markets.

Graduate retention

Restricted movement limits the number of international graduates who will be able to stay in the UK to meet skills shortages and add value to our country.

Long-term, graduate retention is also a major problem. 30% of students who joined UK-based landscape courses in 2018 were international, with 7% being from the EU. Therefore, restrictions on visas and free movement will limit the number of graduates who will be able to stay in the UK, meet skills shortages, and add value to our country.

Trade restrictions

Any restrictions on trade with Europe would make landscape practice much harder, as many of the materials landscape professionals use are sourced from the EU. For example, live plants or stone products from places like Italy.

Just like food, plants can’t afford to be held up in a lorry park in Kent, France or Belgium for days. It would take many years for British nurseries to grow similar trees, and for British quarries to be re-opened, in order to rebuild an adequate supply chain.

Any extra administrative burdens for the supply of landscape products into the UK will make them much less attractive to both public and private sector investors and developers.

Economic effects

If landscape professionals are forced out of work, the long-term effects could take decades to correct.

Less money in the economy means there will be less development, including housing. This is a current government priority and what development does happen will be cheaper, less well designed, and less green.

If landscape professionals are forced out of work by an economic downturn, the long-term effects on public health, air quality, flood risk, and climate change could take decades to correct.

To find out about how ProHort can help you, get in touch now.

Articles Similar to The Landscape Institute and Brexit:

England’s Peat Action Plan!

National planning policy framework NPPF

Changes in Biodiversity Requirements

To read more articles like this click here…

National planning policy framework NPPF

The National Planning Policy Framework (NPPF) sets out government planning policy for England. It was published by the Department for Communities and Local Government (now the Ministry of Housing, Communities and Local Government (MHCLG)) on 27 March 2012 and can be downloaded from the MHCLG website.

The NPPF followed a commitment made in the 2010 Coalition Agreement to ‘publish and present to Parliament a simple and consolidated national planning framework covering all forms of development and setting out national economic, environmental and social priorities’. The then-Minister for Planning and Decentralisation, Greg Clark MP, suggested it introduced a simpler and more accessible approach to planning policy.

The framework replaces a wide range of previous planning policy statements and planning policy guidance (see Planning policy replaced by the NPPF). It is commonly cited as having reduced planning policy from over 1,000 pages to around 50, but in fact, unless specifically revoked by the framework, existing policies remain effective.

In 2012, the coalition government commissioned the Taylor Report, a further review of the remaining planning policy guidance. A complete set of the legislation, policy and guidance that underpins planning in England can be found on the government’s National Planning Practice Guidance website.

 

 

Principles

The NPPF dismantles the regional planning apparatus and introduces neighbourhood planning in order to create ‘ … a framework within which local people and their accountable councils can produce their own distinctive local and neighbourhood plans, which reflect the needs and priorities of their communities.’ The framework states in no uncertain terms that ‘the purpose of planning is to help achieve sustainable development……Development that is sustainable should go ahead, without delay.’

It defines three mutually dependent dimensions to sustainable development:

  • Economic
  • Social
  • Environmental

The framework sets out 12 core principles that should underpin plan making and decision taking which are presented in summary below.

Plan making and decision making:

  • Genuinely plan-led.
  • Should be a creative exercise, not just one of scrutiny.
  • Proactive in driving and supporting sustainable development.
  • Should seek and secure high quality.
  • Take account of the diverse character of different areas.
  • Should support the transition to a climate-resilient, low-carbon economy.
  • Contribute to conserving and enhancing the natural environment and reducing pollution.
  • Should encourage the use of brownfield land.
  • Encourage mixed-use development.
  • Should conserve heritage.
  • Maximise the use of public transport, walking and cycling.
  • Should support health, social and cultural wellbeing.
The framework then sets out detailed guidance under 13 subheadings that contribute to delivering sustainable development:
  • Building a strong, competitive economy.
  • Ensuring the vitality of town centres.
  • Supporting a prosperous rural economy.
  • Promoting sustainable transport.
  • Supporting high-quality communications infrastructure.
  • Delivering a wide choice of high-quality homes.
  • Requiring good design.
  • Promoting healthy communities.
  • Protecting Green Belt land.
  • Meeting the challenge of climate change, flooding and coastal change.
  • Conserving and enhancing the natural environment.
  • Conserving and enhancing the historic environment.
  • Facilitating the sustainable use of minerals.

Local plans

Local plans should be prepared by each local authority for its area. They should contribute to the achievement of sustainable development and set out over a 15-year time horizon ‘…the opportunities for development and clear policies on what will or will not be permitted and where…’

The framework proposes proactive engagement and collaboration with neighbourhoods, local organisations and businesses as well as co-operation with neighbouring authorities, public, voluntary and private sector organisations. It also proposes improving the efficiency of the application process through pre-application engagement by the applicant with the local authority, other consenting bodies and the local community. This should include discussing what information should be submitted as part of the application.

The framework sets out strategic priorities that should be included in local plans and makes clear that local plans will be examined by an independent inspector. Proposed developments that are in accordance with an up to date local plan should be approved without delay, whilst those that conflict with an up to date local plan should be refused (unless material considerations indicate otherwise).

This puts an emphasis on the local plan being up to date. The framework states that If a plan is absent, silent or out of date, permission should be granted, unless there are significant and demonstrable reasons not to grant permission. Local authorities were given a 12-month transition period to ensure that existing plans conform with the framework. However, when the transition period came to an end in March 2013, just half of the local authorities had adopted local plans in place and the Planning Inspectorate revealed that only 7% of those local plans complied with the requirements of the NPPF (ref. Planning Resource).

Neighbourhood planning

Parishes and neighbourhood forums are given the power to develop a neighbourhood plan for their neighbourhood. Neighbourhood plans must conform with the strategic policies in the local plan but take precedence over non-strategic policies in the local plan where they are in conflict.

Parishes and neighbourhood forums are given the power to grant planning permission for developments through Neighbourhood Development Orders and Community Right to Build Orders. Neighbourhood Development Orders and Community Right to Build Orders require a local referendum. Where a planning application conflicts with a neighbourhood plan planning permission will not normally be granted.

Criticisms

A number of significant concerns have been raised about the framework and its implementation:

  • There may be unintended consequences resulting from such a significant change being made so quickly.
  • There is ambiguity about the precise meaning of phrases such as ‘sustainability’.
  • The framework says little about spatial planning or place making.
  • It is questionable whether there are adequate resources available to implement the changes that the framework brings about.
  • There is a lack of guidance for local communities.
  • It is not clear how the framework tackles the lack of housing.
  • It is not clear whether local plans will be able to retain control over development.

The Taylor Report has come very close on the heels of the National Planning Policy Framework and there are concerns that the planning system could be thrown into disarray. Some campaigners have described the findings of the review as giving the go ahead for a bonfire of planning rules, creating a charter for development and putting the countryside at risk.

In April 2014, the all-party Commons Communities and Local Government Committee launched an inquiry into the operation of the NPPF. The inquiry found weaknesses in the NPPF and proposed a number of changes that could be made to strengthen it. See NPPF inquiry for more information. In March 2015, a survey of residential developers and housing associations by accountancy and business advisory firm BDO found that 52% per cent felt the NPPF had made no difference, 19% per cent said it had inhibited the process and only 29% believed it had been helpful.

Reform

On 7 December 2015, the Department for Communities and Local Government launched a consultation seeking views on changes to the NPPF to support the delivery of new homes, including low cost homes for first time buyers. See Consultation on proposed changes to national planning policy for more information.

In April 2016, the Communities & Local Government (CLG) Committee published ‘Department for Communities and Local Government’s consultation on national planning policy’ in which they called for a comprehensive review of the NPPF before the end of the Parliament, pointing out that there had been, ‘…no robust, objective or evidence-based monitoring, evaluation or review’ since it was first published in 2012.On 30 January 2018, in a letter to local authorities, the Chief Planning Officer confirmed that the NPPF was being revised to implement the planning reform package set out in the housing White Paper, the Planning for the right homes in the right places consultation and the announcements made in the 2017 Autumn Budget.

Overhaul announcement

On 5 March 2018, Prime Minister Theresa May launched the overhaul of the NPPF, aiming to maximise the use of land, strengthen Green Belt protections and place a greater emphasis on converting planning permissions into built homes. Mrs May said the cost of housing, both for ownership and rent, was reinforcing economic divisions and leading to growing social immobility, with public sector workers unable to take jobs in certain parts of the country. She said; “The result is a vicious circle from which most people can only escape with help from the bank of mum and dad. Talking to voters during last year’s election campaign, it was clear that many people, particularly younger people, are angry about this … They’re right to be angry.”

Pending a consultation, May said the existing NPPF will be overhauled with up to 80 proposals first put forward in 2017 being implemented. The key measures include:
  • 10% of homes on major sites should be available for affordable home ownership.
  • Builders should be more open about affordable housing commitments at the planning stage.
  • Before issuing future planning permission, local authorities will be able to take into account the speed with which a developer builds on a site. Councils will also be able to consider revoking planning permission after two years if the building has not begun.
  • Councils will have to adopt a new nationwide standard showing housing need in their areas.
  • Infrastructure will need to be considered at the pre-planning stage.
  • Ancient woodland and aged trees will get specific protection.
  • Homeowners will be able to add two storeys to existing properties.

But May’s accusation of obstruction on the part of some councils led to a strong response from the chair of the Local Government Association Gary Porter, who said: “The truth is that councils are currently approving nine in 10 planning applications, which shows that the planning system is working well and is not a barrier to building. Nearly three-quarters (73%) of planning refusals are upheld on appeal, vindicating councils’ original decisions. It is completely wrong, therefore, to suggest the country’s failure to build the housing it desperately needs is down to councils.”

Furthermore, Porter said that the government’s proposal to appoint independent inspectors where councils were considered to be blocking housing development was “unhelpful and misguided.” He also called for councils to be able to borrow to build their own houses, a proposal in line with Labour’s housing policy, and one that has been rejected by government. In response to May’s speech, shadow Housing Minister John Healey said; “This housing crisis is made in Downing Street. It’s time the Tories changed course, and backed Labour’s long-term plan to build the genuinely affordable homes.”

Revised National Planning Policy Framework

In July 2018, following the public consultation, the government published a revised NPPF. The new framework focusses on the following key areas:

  • Promoting high-quality design for new homes and places.
  • Offering stronger protection for the environment.
  • Constructing the right number of homes in the right places.
  • Focusing on greater responsibility and accountability of councils and developers for housing delivery.

The revised framework will enable councils to refuse planning permission for any development that does not prioritise design quality or adequately complement its surroundings. It will also encourage councils to adopt new visual tools to promote better design and quality.

Councils will be able to use the new ‘rulebook’ to calculate the housing need for their community and deliver more housing when it is most needed. From November 2018, a Housing Delivery Test will be available, helping to drive up the number of homes delivered in an area. In terms of the environment, the framework was updated to further protect biodiversity by more closely aligning the planning system with Defra’s 25-year Environment Plan. Not only does this plan protect habitats, it also emphasises air quality protection in relation to development proposals.

Secretary Of State

Secretary of State for Communities, Rt Hon James Brokenshire MP said; “Fundamental to building the homes our country needs is ensuring that our planning system is fit for the future. This revised planning framework sets out our vision of a planning system that delivers the homes we need. I am clear that quantity must never compromise the quality of what is built, and this is reflected in the new rules.”

However, the revised NPPF received some criticism, with the NFB chief executive Richard Beresford suggesting that; “The government has missed a golden opportunity to put this country on the road to addressing its housing crisis and solving the broken housing market.” John Acres, RTPI President, said; “…we must recognise the significant pressure the new NPPF requirements will put on local authority planning teams. It is imperative that chief executives, council leaders and politicians resource planning departments sufficiently, particularly as they will now be held more accountable for delivery under the housing delivery test and are expected to carry out more regular reviews of their plans.”

Find out how we can help you or get in touch to find out more.

 

Why Do You Need A Landscaping Scheme?

What is a Landscaping Scheme?

Landscaping schemes are an important part of any planning application or development project. Do you need a landscaping scheme?

Often requested by the local authorities, landscaping schemes contain an overview of a project from start to finish. This makes it perfect for using to oversee a tender or managing an alternative contractor throughout the installation. It provides you with guidelines and recommendations for a high quality landscape.

As horticultural specialists, we work closely with you and your client to ensure that the design fulfills and exceed all requirements and expectations. By giving you all of the details needed to make the project run smoothly, we can help make the landscaping or development process as pain-free as possible.

 

Landscaping Scheme
Our landscaping scheme packs include:
  • Site brief including photographs of the existing site and details of any existing landscaping features;
  • Concept description and design aims;
  • Tree survey, if required, providing details of any trees located on and around the property and recommendations for the management of these;
  • 3D landscape visualisation;
  • Landscape plan;
  • Planting plan including plant key;
  • Dimensions plan;
  • Materials and construction plan;
  • Complimentary proposal for the completion of the work.

As well as the full pack, we can also provide you with individual tree surveys, planting plans, materials plans or a detailed 3D landscape visualisation depending upon the project requirements.

If you need a landscaping scheme or would like to find out more, please get in touch or why not visit our Landscaping Schemes page for details on Pricing?

Landscape Strategy in London

ProHort were commissioned to prepare a Landscape Strategy in London for the proposed redevelopment of a pre-existing equestrian. The primary purpose of the strategy was to provide the developers and local council with a document that responded to existing local borough environmental policy, sustainability and transport initiatives and the concept plan. The strategy incorporated the principles set out in these and incorporated certain ideas and initiatives into the landscape strategy proposals. The strategy was designed to be flexible in order to adapt to change and to respond to a place that is by its nature ever changing.  And provides a long-term vision for the enhancement of the site.

The principal concern of the local council was the potential impact on the ecological value of the site. Having been vacant for a number of years the area had become overgrown resulting in the development of numerous valuable wildlife habitats identified as scarce in the local borough. The strategy was informed by visiting the site and utilising existing ecological and arboricultural surveys to help formulate a holistic methodology designed to not only retain the most valuable ecological features identified but to proactively manage these and further improve them.

In addition, the strategy outlined methods to create further wildlife habitats through the planting of carefully selected plants such as the inclusion of species most beneficial to invertebrates within the proposed hay meadows of the site. This, together with careful management of the meadows and other areas were designed to provide a valuable food source for locally at-risk species such as bats. Furthermore, the strategy considered the character of the site and local perception of it. The inclusion of a designed tree shelter belt was put forward to help retain its existing character as a wooded space.

If you need a Landscape Strategy for your development, get in touch now or check out the Landscape Strategy page for more information.

Creating a Landscaping Scheme in Derbyshire

Landscaping Scheme

A landscaping company contacted us to put together a comprehensive landscaping scheme in Derbyshire, for the grounds of a property that they had been instructed to landscape.

The company were looking for an overview of what would be required for the landscaping of the works. This included the existing features that would need to be considered when landscaping, a 3D landscape plan, planting plan and material and construction plan to give recommendations for the construction of the various elements. There were also a number of trees on the site which required a tree survey. This was to address whether they would remain on site or be removed.

Landscaping Scheme Process

When the landscaping company initially contacted ProHort, a site visit was organised with our Specialist Consultant. At this site visit an in-depth discussion was held between our Consultant, their Director and the landscaping company’s client to ensure we fully understood all the requirements.

Their client had done a lot of research before coming to them, so they had plenty of ideas and detail to influence the design of the landscaping scheme. As such we were provided with a topographical survey of the site, assisting in the 3D landscape plan and ensuring accuracy in all of our plans. Topographical surveys can also be a useful addition to a planning application. As they outline the levels of the site and identify any issues that may come up when landscaping or constructing on the site.

Following the site survey our specialist consultant worked closely with our client manager to begin the process of creating the 3D Landscape Design – we offer the option of either a Landscape plan and a 3D landscape design. All the specifications, measurements and ideas gathered from the initial site visit were input into the landscape design and corresponding plans to ensure that the requirements of the project were met.

Once this was completed, the landscaping company and their client were invited into our offices for a meeting. During this meeting, the initial design was discussed in depth with our client manager and specialist consultant with a preview of the 3D Landscape Design given. This allowed the client to take a virtual walk around the design and make any amendments before the 3D Landscape Design is finalised.

Landscaping Scheme in Derbyshire

Landscaping Scheme

Now that the design was confirmed, the full Landscaping Scheme was compiled. Included in the scheme were:

 

 

 

 

Once the landscaping scheme in Derbyshire was completed, an electronic PDF file and a hard copy was sent over to our client, the landscaping company. They were then able to pass this information onto their client and use the documentation to assist them in completing the landscaping.

It was a delight to work on this landscaping plan and bring all the ideas of their client together to provide the visual representation and detailed plan for the local landscaping company.

Contact us!

Find out more about our landscaping schemes or get in touch to chat to our client managers.

If you require are looking to have a landscaping scheme in Derbyshire, then ProHort Ltd is the company for you! Our professional and experienced team will be happy to assist.

Japanese Knotweed Damages Allowed Where Use of Land Affected

Landowners including local authorities and other public bodies may be at risk of nuisance claims following the recent ruling of the Court of Appeal in Network Rail Infrastructure Ltd v (1) Williams (2) Waistell [2018] EWCA (England Wales Court of Appeal) Civ 1514. This case concerned the liability in nuisance of a landowner where Network Rail had allowed Japanese knotweed to grow in close proximity to its neighbours’ land. This is the case even though no actual damage was caused.

The Court of Appeal found in favour of two homeowners who had sued Network Rail after knotweed from a railway embankment had spread to their properties.

The Court of Appeal went to great lengths to state that the presence of Japanese knotweed was not actionable under a nuisance claim because it had diminished the market value of the respondent’s properties. The decision means that those claiming nuisance will need to demonstrate that the nearby presence of Japanese knotweed interferes with their use and enjoyment of the land.

Japanese Knotweed

However, in practice, the presence of Japanese knotweed is always likely to interfere with a property owner’s use of enjoyment of the land. Furthermore, the presence of the Rhizomes, despite not causing any physical damage, was noted by the judge as being a “natural hazard”. The Judge said. “They affect the owner’s ability fully to use and enjoy the land.”

What Is Japanese Knotweed?

Japanese knotweed, which was described by the court as a “pernicious weed”, is a fast-growing plant which is difficult to eradicate and spreads rapidly through an extensive network of underground roots, stems or rhizomes. While the plant itself can quickly grow to a height of over two metres, the roots can extend up to seven meters horizontally and three metres vertically, affecting buildings and construction works.

Because of the potential ramifications of Japanese knotweed on the property, the Council of Mortgage Lenders (CML) has published a policy stating that it might affect the valuation of the property and might be an issue for customers whose property is affected but who cannot afford the treatment costs. The policy requires the valuers who inspect property for mortgage purposes to report on the presence of knotweed within seven meters of the property to lenders, so that they can take account of it as part of the valuation process.

Sir Terence Etherton, giving the judgment of the Court of Appeal, described a claim of private nuisance as one based on “a violation for real property rights”. This violation need not necessarily take the form of physical damage to property; however, it could not consist of merely pure economic loss.

In view of the above, to minimise risk of liability landowners and public bodies should take steps to identify if any Japanese knotweed is present on their land and then take steps to eradicate it.

Contact Us

If you have issues with Japanese knotweed then please contact us today…

Subsidence Reports: Avoid That Sinking Feeling

What Causes Subsidence?

Subsidence happens when the ground under your house collapses or sinks lower. When this occurs it puts a significant amount of strain on your home if one side sinks and cracks can begin to appear. There are several reasons why this might happen to your house, this includes geological, man-made and seasonal variations. For example, periods of drought can cause the soil to dry out, especially if the soil is made of clay, making the ground unstable. Other reasons for subsidence include trees and shrubs close to your foundations or drains that are leaking water causing the soil to become soft and begin to compact under the weight of your home.

What are the signs of subsidence?

Cracks can appear in your home for several reasons such as natural shrinkage and swelling due to temperature and humidity changes. Cracks that indicate subsidence are usually more than 3mm thick and wider at the top than the bottom. They are often found close to doors and windows, and you may notice other signs such as wallpaper crinkling at wall joins, doors sticking and cracks to your extension.

subsidence reports

Can I prevent subsidence?

Minimising the risk of subsidence is, indeed, possible, particularly if your house is at risk. For example, plant trees or shrubs a safe distance from your home to avoid the soil around it becoming too dry. It is also advisable to undertake regular maintenance on external guttering, pipes and plumbing and install a water butt in your garden to catch rainwater.

What are subsidence reports?

Subsidence reports will give you a risk rating, which is an overall opinion of your property’s level of subsidence risk, from low to very high. They then go into further detail, giving an in-depth explanation as to why your property has been given its risk rating. We will also make suggestions for actions that could be taken to reduce the risk.

We also provide detailed subsidence information, which is essentially an in-depth explanation of subsidence and its main causes, alongside other lesser-known factors. This can help to home buyers to make more informed decisions about the property they are considering buying.

Finally, subsidence reports details information about remedial works that would be legally acceptable to have carried out.

Find out more about how we can help you with Subsidence reports by visiting our web page.

If you suspect your property may be experiencing subsidence, then get in touch. We can advise you on the best courses of action going forward and whether home insurance providers should be contacted. We also work with insurance companies, solicitors, surveyors, and local adjusters to ensure the right result is achieved for you.

Expert Witness – What Are They?

An expert witness is a person with an in-depth knowledge of their field, and the primary function of an expert witness is to give an independent option, based on their own impartial findings. The information can be delivered in several different ways, including a report, or verbally in court.

There are countless numbers of reasons why an expert witness may be needed but, in the field of horticulture, the most common involve disputes between two parties over the following topics:

  • Japanese knotweed, and other non-native invasive species. For this, a specific report that is Part 35 compliant is often required.
  • Subsidence caused by trees, hedgerows, or other significant vegetation.
  • Damage caused by trees, including fires, decay, and damage as a result of extreme weather.

 

How can we help?

ProHort has an in-house expert witness, capable of working on a wide range of cases within the fields of horticulture, arboriculture and invasive weeds. We have over twenty years’ experience in the industry, can produce a Part 35 compliant report and are happy to appear in court when required.

In addition to this, we are listed on the UK Register of Expert Witnesses, so you can be certain that you are in safe hands.

If you are in the middle of a dispute and need some advice from an expert, why not get in touch and we will be happy to assist. Alternatively check out our Expert Witness page to find out more.

What Is a Soil Analysis, And Why Would I Need One?

Soil Testing

You may be surprised to hear this, but soil is very important. The composition on site can drastically impact upon the progress of a development, and the cost of completing it. Find out more about soil analysis down below…

In many cases, a soil test and analysis may be required, which can be an essential part of the development process. If the land has already been identified as being contaminated, then the importance of obtaining a Soil Analysis Report increases as you will require additional considerations from your local planning authority.

 

But, what is a soil analysis?

A soil analysis is a test which is carried out on the soil to discover many details, including acidity, composition, content and pH levels. The complexity of the test altered to suit your individual requirements, we can test for a single nutrient, or we can test the full spectrum including any organic matter, nitrogen levels, and any heavy metals within the soil.

To conduct an analysis, our surveyor will attend the site and take a number of samples from different locations across the site. This is then tested, giving us an average of the soil composition across the site.

 

Why would I need a soil analysis?

If you are undertaking any sort of project, then a soil analysis can be useful for you. If you are developing on a site, then the analysis will help you to identify the type of soil you are building upon, highlighting any potential problems before they arise.

If you need to remove soil from a site and taking it to a waste disposal facility, it is likely that they will request a soil analysis before taking the waste, as they may be required to charge you a hefty landfill tax. By having a soil analysis completed well in advance, you will be aware of the issues and be able to budget for it in advance.

Another situation where a soil analysis can be a vital tool is on a site where a large amount of planting is going to take place. The analysis will determine the different nutrients and chemicals in the soil, and this information can help you to make an informed decision on which plants to select, ensuring that they can thrive in the environment.

Find out more information about soil analysis on our Soil Analysis page, or get in touch to discuss your requirements.