Accredited analysis for water-industry soil-reuse compliance — keeping your installation programme stable and adoption-ready.
You may need UKWIR testing if you’re installing new water mains or service pipes on a brownfield site, a redevelopment plot, or land with any potential contamination history.
Water companies and Self-Lay Providers (SLPs) require UKWIR-compliant evidence to confirm the ground will not degrade or permeate water pipes.
This early clarity protects you from last-minute delays and unplanned redesign.
UKWIR (UK Water Industry Research) provides the official guidance used by water companies to decide which pipe materials, barrier systems, or protective coatings are suitable for installation on contaminated or potentially contaminated sites.
A UKWIR test identifies contaminants that may affect pipe integrity — including chemicals capable of permeating plastics, attacking metal pipes, or compromising long-term safety.
Our testing is aligned with the UKWIR Guidance for the Selection of Water Supply Pipes to be Used in Brownfield Sites (Ref 10/WM/03/21).
Send your postcode, a brief site summary and planned pipe routes for a fast, accurate recommendation.
Physical or biological signs:
Administrative Indicators
Early instruction avoids redesign cost and programme friction.
| Service | Purpose | Outcome |
|---|---|---|
| Site Review & Desk Study | Assess historical land use and contamination risk. | Confirms sampling locations and test scope. |
| Soil Sampling & Accredited Laboratory Testing | Targeted sample collection and full UKWIR analysis. | Independent, chain-of-custody laboratory data. |
| Typical Analyses Include | ||
| • Petroleum hydrocarbons (TPH, BTEX, MTBE) | Identify organic contamination affecting pipe permeation. | Defines material suitability. |
| • VOCs / SVOCs | Assess volatile and semi-volatile contaminants. | Ensures safe selection of pipe barriers. |
| • Phenols & chlorinated compounds | Identify legacy industrial contaminants. | Supports correct coating specification. |
| • Heavy metals | Assess corrosion potential. | Protects long-term pipe integrity. |
| • Soil pH, electrical conductivity, redox potential | Evaluate chemical environment around pipes. | Confirms compatibility with pipe materials. |
| UKWIR-Compliant Reporting | Submission-ready documentation for water company or SLP. | Clear, traceable, UKAS-accredited results. |
| Pipe Material Selection Advice | Determine correct pipe type, barrier system or protective coating. | Adoption-ready specification with no ambiguity. |
That’s how evidence stays proportionate, pipe selection stays compliant, and your installation programme keeps moving.

Send a brief summary of your project, pipe routes and any known contamination. We confirm the correct UKWIR test suite and sampling plan.

Samples are collected and analysis is carried out by UKAS-accredited laboratories.

You receive a clear, UKWIR-compliant report with pipe-material recommendations and supporting certificates.
Year-round
Typically within 10 working days from receipt of sample receipt
Nationwide coverage across the UK
Fast-track available for urgent SLP or contractor deadlines
Each week gained here protects your adoption programme and prevents costly redesign or resubmission.
UKWIR testing supports compliance with:
Missing or incorrect UKWIR evidence can result in:
Early alignment ensures your water company receives clear, compliant evidence on first submission — preserving programme stability.
Need UKWIR testing? We’ll confirm the right test suite and deliver UKAS-accredited, UKWIR-compliant results — fast.
Phone: 0800 494 7479
Email: [email protected]
Not always — but you do if the water company, SLP or local authority requires contamination evidence before approving pipe materials. If the ground has any industrial, commercial or fuel-storage history, testing is almost always mandatory.
Testing includes petroleum hydrocarbons (TPH, BTEX, MTBE), VOCs/SVOCs, phenols, chlorinated compounds, heavy metals, and supporting soil parameters such as pH, electrical conductivity and redox potential.
No. A Phase 1 or 2 assesses environmental risk; UKWIR testing specifically determines pipe material compatibility and adoption compliance. Many brownfield projects require both.
It depends on the size of the pipe route, contamination history, and variability of Made Ground. We provide sampling guidance or attend site directly.
Yes — most SLPs must submit UKWIR-compliant evidence to water companies before mains adoption.
Yes. The laboratory data determines whether you need:
This prevents costly replacement later.
Typically within 10 working days of sample receipt, with fast-track options available.
Yes — or we can provide detailed sampling instructions if your contractor prefers to collect.
Yes — results are UKAS-accredited and aligned with UKWIR Ref 10/WM/03/21.
Indirectly. Planning conditions relating to utilities or contamination often require evidence before connection or adoption.
Yes — water companies may refuse connection or adoption without compliant laboratory results.
We conduct sampling and reporting across England and Wales.